Renovating your home can significantly upgrade your life and comfort, but there’s no denying that the disruption and expense can be stressful. When problems arise, triple that stress.
Fortunately, by staying calm, understanding the legalities and communicating well, you can minimize the chaos. Here’s how to stay on track through four delicate situations you might encounter.
• Discovering Structural Surprises
Ireland’s housing stock is in poor condition, so the odds of unpleasant shocks are unfortunately not low. The Working Group on Defective Homes estimates that 50-80% of Celtic Tiger era apartments — built between 1991 and 2013 — have structural, fire safety or water ingress defects.
Additionally, any house may contain unpleasant surprises such as damp, subsidence, outdated wiring or asbestos. To plan ahead for contingencies, consider the following:
• Contingency fund: Set aside a portion of your total renovation budget for unexpected issues.
• Risk assessment: Before starting, have any legally required surveys completed. For example, if your home was built before 2000 and you plan to disturb walls or ceilings, you must have a refurbishment or demolition asbestos survey completed by a licensed asbestos professional before work begins. Consider optional electrical or structural surveys if your property is old.
• Insurance: Check whether your home insurance policy covers renovation-related risks and consider adding additional coverage if necessary.
If you do discover structural defects or other issues, pause your project and consult expert advice on how to proceed.
• Budget Blowouts and Hidden Costs
Renovations are notorious for exceeding budgets. Unexpected expenses include regulatory compliance, inflation, and rising materials and labour prices.
Prevent this problem by setting a realistic budget to begin with. Investigate SEAI and local authority grants, which might help you offset costs. For instance, the National Retrofit Program aims to retrofit 500,000 homes for optimal energy efficiency by 2030.
If the budget does get out of control, defuse the situation by negotiating with contractors and considering your costs. Here’s how:
• Get everything in writing: This helps avoid misunderstandings and makes it easier to track schedules.
• Communicate regularly: Insist on regular updates and keep a record of all decisions and changes.
• Be realistic: Evaluate whether inexpensive makeover options work just as well for your garage or other less-used rooms. A new coat of paint for the former generally costs a few hundred dollars compared to the thousands a renovation might.
• Don’t be afraid to walk away: If a contractor is unwilling to be clear about where your money is going or evasive about implementing changes, consider other options.
Stay calm and remember that you are the customer, so the power is in your hands. Treat your contractors with respect but require the same in return.
• Neighbour Complaints and Disputes
Disagreements with neighbours are common during renovation projects, often caused by noise, dust, boundary issues, parking or alterations to party walls. Plan to mitigate this issue by communicating proactively before the project begins:
• Let neighbours know: Tell them what you’ll be doing and how long it’s likely to take.
• Plan to minimise disruption: For example, ask professionals about using hydrovac trucks instead of traditional digging to limit disturbance and reduce damage risks, especially for shared utility pipes.
• Understand your obligations: You must compensate your neighbour for work to a party structure, and they can apply for a court order if you don’t.
• Use mediation: If the situation does deteriorate, seek advice on the many mediation services available to help you resolve it.
By communicating clearly and well in advance, you can hopefully keep your neighbours on side during your renovation, but do understand how disruptive it can be to them.
• Supply Chain Delays and Material Shortages
This is a major issue with Irish building works at the moment. The Irish Concrete Federation has warned that the supply of aggregates is critically threatened, while factors such as Brexit and global supply chain issues are having knock-on effects. There is also a major construction and craft trades labour shortage, attributed to delays in apprenticeship completions during the COVID-19 pandemic.
If you run into these problems, here’s how to address them:
• Use substitute materials: Ask your contractor about alternatives that meet Irish building standards.
• Prioritise local suppliers: Try to reduce reliance on long shipping routes or customs delays.
• Pre-order supplies: Order key materials as early as possible to lock in prices and reduce delays.
• Resequence tasks: For example, carry out painting before flooring if the flooring is delayed.
• Be honest about the delays: Explain the situation to family members and neighbours and ask for patience.
Advance planning and a flexible construction schedule can help mitigate this problem.
From Crisis to Calm — Your Renovation Can Be Rescued
It’s easy to panic when things go wrong during a big home upgrade. Planning can help prevent this, but if the worst does happen, prioritise communication above all else.
Most renovation issues can be resolved with patience, diplomacy and flexibility, so hang in there — it will be worth it in the end.